28% Average cost overrun
Rising to 45% on projects above $100 million. Schedule overruns from rework alone reach 22%.
Supply chain & industry · India & South Asia
And the average project still overruns by twenty-eight percent.
the period in which US highway, street and bridge productivity declined, while industrial building rose.
Source: US Bureau of Labor Statistics, construction labor productivity
In India
Platforms in this market
Rules that apply here
We read the rule before the call. It is the cheapest way to prove we did the work.
What is happening
Rising to 45% on projects above $100 million. Schedule overruns from rework alone reach 22%.
Most of it traceable to information that existed but did not reach the crew before the work was done.
Drawings, RFIs, change orders and daily reports move at different speeds. The crew builds to what they have.
What was actually completed, when, and by whom is reconstructed from photographs and recollection at billing time.
However hard, whatever it is
We wrote this about drawings reaching the crew. If yours is procurement, plant or a subcontractor nobody can track, we start the same way.
01 Days where the work happens, not a workshop in a meeting room. We watch the job get done and write down the shortcuts nobody wrote down.
02 Your data, your rules, your vendors and their documentation, and the published research on your sector. We report what is actually in there.
03 Not which tool fixes this. What is actually causing it, taken apart until we reach the piece that cannot be divided further.
04 Weeks, not quarters. By this point we are not guessing what to build, and guessing is the thing that makes projects long.
Where we sit
What you get
Built new for you — none of this exists in your stack today
What you already run — unchanged, and still yours
If it happens on site, we can capture it. A drawing marked up in pen, a delivery note left in a cab, a camera on a mast. All of it becomes a record.
No API
No documentation
A terminal from 1994
It arrives as paper
The vendor said no
It reports nothing Not a list of limits. Name yours on the call.
And once we can reach it, a model can read it. Most of the value here is in the sources nobody ever structured — the note, the letter, the screen.
Intelligence, plumbed in
The work is the boring half: a connector to the drawing store, one naming standard across trades, and a scored test set.
How we make AI survive real data
Connectors
A semantic layer
Evals you can check What changes
Less rework Drawing revisions, RFI answers and change orders pushed to the field, with acknowledgement recorded.
Evidence Timestamped, located and attributable, so the progress claim is documented rather than argued.
Earlier Not at the month-end review, when the decision point has already passed.
Who this is for
Project Director
Commercial Manager
Site Manager
Head of PMO
Finance Director Straight answers
They will not, and they should not have to. Anything we build for the field either replaces something they already do or captures information passively. If it adds a step, it will be abandoned in week two — that is not a training problem, it is a design failure.
Yes, alongside them. They are systems of record for documents and RFIs. The gap is usually between them and the commercial and scheduling systems.
Yes. We work with clients in the US, Europe and India. The systems differ more by contractor than by country, so neither is a stretch.
Read the marked-up drawing, the delivery note and the site photo. We score it against a month of real records before the site relies on it.
For construction that means RERA, GST e-invoicing, the National Building Code and state labour cess. We read the rule before the call, so the first meeting is about your operation rather than about us catching up.
What you already run stays where it is. Around it we build software, hardware and the process itself. Here that means a site app that works in a basement with no signal.
See everything we build
Software
Hardware
Ways of working
Whole ventures Honest about the numbers
We have not localised it, because a number nobody can check is worth less than a real one plus this sentence. The pattern travels. The size of it in your market is a question for the call.
Same industry, other markets