Manufacturing

Every plant you add keeps its own production record

How do we give auditors one traceability story across plants we acquired with different systems?

Book a 20-minute call Free. No demo, no slides.

Figures and rules on this page apply to

United States

Working somewhere else? The shape of the problem usually travels. The deadlines do not.

What this looks like

A customer asks where a component lot went. One plant answers from its production system in minutes. The acquired plant pulls paper travellers from a filing room. The third exports a spreadsheet with different column names. Quality stitches the answer together by hand while the customer waits.

The numbers

Every figure here is someone else’s. Check them.

  • 2 Feb 2026date the FDA's Quality Management System Regulation took effect, bringing in ISO 13485:2016 by reference
  • 35%share of FY2020 device inspection findings for corrective action, complaints and design controls combined
  • 197corrective and preventive action citations issued to device makers in FY2020, the most cited area

Why it happens

It is not a people problem.

Each plant records production correctly, in its own vocabulary. One calls it a lot, another a batch, another a work order. Their fields line up on paper and mean different things. Traceability breaks where the vocabularies meet, not inside any one plant.

Why your current software has not fixed it

Because it was never built to.

The standard answer is one quality system across every plant. That is a multi-year validation project, and the next acquisition closes before it finishes. Until then, the gap between plants is covered by the people who remember how each site numbers things.

Intelligence, plumbed in

A scanned traveller with handwritten lot numbers is readable, and it can be tied to the right batch.

We build the layer that says what each plant's record means, then read every plant's records through it. Underneath it: a connector, one agreed meaning per field, and a test set scored on your own records.

How we make AI survive real data
  • Connectors
  • A semantic layer
  • Evals you can check

However hard, whatever it is

Acquired plants are one example. Bring the record nobody can find in time.

We wrote this for contract device makers because the new regulation makes it current. The same approach works for any regulated maker running more than one site.

  1. 01

    We sit with you

    Days where the work happens, not a workshop in a meeting room. We watch the job get done and write down the shortcuts nobody wrote down.

  2. 02

    We read everything

    Your data, your rules, your vendors and their documentation, and the published research on your sector. We report what is actually in there.

  3. 03

    We break it to first principles

    Not which tool fixes this. What is actually causing it, taken apart until we reach the piece that cannot be divided further.

  4. 04

    Then we build

    Weeks, not quarters. By this point we are not guessing what to build, and guessing is the thing that makes projects long.

What we build

Specific enough to argue with.

Four mechanisms, not four features. Each one is a thing that happens on its own, every day, whether or not anyone remembers to run it.

  • Travellers, inspection sheets and certificates read from every plant, paper and scanned included.

  • One agreed meaning for lot, batch and work order across sites, held above each plant's own system.

  • A traceability answer, component to finished device, put together in minutes for any lot at any plant.

  • Each newly acquired plant connected to the same layer in weeks, not after a validation cycle.

How you would know it worked

Numbers in your own reporting, not ours.

  • Time to answer a customer or auditor traceability request, per plant.
  • Share of production records captured without manual re-entry at acquired sites.
  • Traceability findings at the next audit.

Straight answers

Where a model is involved, it is scored against your own records first. Accuracy per source, not one flattering average.

The questions this raises

  • We plan to move every plant onto one quality system. Why do this first?

    The move needs the same mapping between plants anyway. Building it first gives auditors one answer now and shortens the migration.

  • Does this need to be validated?

    Anything that feeds a quality decision is validated for its intended use. We scope it so the record of truth stays in your validated systems.

  • What about plants that still run on paper?

    They are the usual case. Scanned travellers and handwritten entries are read and linked like any other record.

Also in manufacturing

The meaning is not in any schema

Two systems agree on the field and disagree on what it means.

The rule lives in a document, or in what one site has always called something, or in a habit nobody wrote down. Joining the data is the easy half; agreeing what it means is the half that is actually the work.

Consent rules, site vocabulary, what an hour counts as. Wherever two systems agree on a field and not on what it means.Describe the disagreement.

Traceability across plants is a translation problem, not a replacement project.

We build the layer that says what each plant's record means, then read every plant's records through it.

See everything we build
  • Software
  • Hardware
  • Ways of working
  • Whole ventures